A Bridge Too Far?

Those of you who attended the last Transport WG Meeting (21 January 2014) will recall that there was a short presentation by Adrienn Tomor about her project to seek funding for a pedestrian bridge over the road at the top of Bridge Valley Road. She also gave a similar presentation at the Stoke Bishop Forum on 29 January 2014.

For those of you who wish to know more about this project, please read Bridge Valley Road Bridge This also gives details of the Open Day at Engineer’s House (The Promenade, Clifton Down) on Saturday 22 February 2014, where information on the project will be displayed. PLEASE NOTE: The date has been CHANGED to Saturday 15 March at Engineer’s House, 10.00 to 12.00hrs.

This entry was posted in Henleaze, NP3, Stoke Bishop, Transport, Westbury-on-Trym. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *